Beach Management Framework
A Tender Notice
by ENVIRONMENT AGENCY
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- 6 year
- Value
- £1B
- Sector
- CONSTRUCTION
- Published
- 25 Jul 2025
- Delivery
- 11 May 2026 to 10 May 2032
- Deadline
- 19 Sep 2025 09:00
Concepts
Location
North East England:
1 buyer
- Environment Agency London
Description
The Environment Agency requires a Framework to deliver its routine and ad-hoc beach maintenance works across all coastal frontages in England that it is responsible for. This maintenance typically consists of moving/transporting large volumes of shingle from areas of accretion to areas of erosion and evenly re-distributing shingle along the sea to restore/maintain the required standard of protection. There is a requirement to import marine dredged or land-based shingle onto coastal frontages to replenish lost material and to conduct maintenance/repairs to coastal defences and structures. There is a requirement to import and place rock on coastal frontages, as well as to provide coastal incident response, recovery and readiness support in the event of extreme weather events. This maintenance is essential to minimise the risk of coastal flooding to residential properties and commercial businesses. Market Engagement was undertaken using PIN notices via the PCR 15 regulations in May and December 2024. The Framework will operate as a single National Lot with a maximum of two Delivery Partners being appointed onto the Framework. The Framework duration will be a six-year (72 month) initial period with a 2-year (24 month) extension option (total eight years). The total estimated value of the Framework will be between £469,000,000 to £1,227,166,000 (exclusive of VAT).
Renewal Options
The Framework duration will be a six-year (72 month) initial period with a 2-year (24 month) extension option (totally eight years).
Award Criteria
Technical | _ |
Sustainability (inclusive of Social Value) | _ |
Price | Commercial |
CPV Codes
- 45200000 - Works for complete or part construction and civil engineering work
- 45244000 - Marine construction works
- 45243000 - Coastal-defence works
- 45243400 - Beach-consolidation works
- 45246400 - Flood-prevention works
- 45246000 - River regulation and flood control works
- 45240000 - Construction work for water projects
- 45246410 - Flood-defences maintenance works
- 71500000 - Construction-related services
- 45243500 - Sea defences construction work
- 45243200 - Breakwater construction work
- 71300000 - Engineering services
Indicators
- Renewals are available.
Legal Justification
Justification for having a 4+ Framework duration: •Specialist marine vessels are in high demand globally, leading to prolonged mobilisation timeframes, this may impact the EA’s ability to deliver their programme of beach nourishment work to meet their obligations under Shoreline Management Plans. • Supports key Construction Playbook policies of Portfolio & Longer-Term Contracting, Commercial Pipelines and Risk Allocation. • The EA requires an 8-year duration to facilitate the delivery of its longer term 8-year pipeline. • The majority of respondents to our second PIN agreed that an 8-year Framework is attractive to the market and encourages greater commitment from the market to invest in specialist vessels, equipment and staff. • A longer duration enables relationships to be built with long-term collaborative Delivery Partners, supporting efficient delivery through programme level optimisation and packaging of work.
Other Information
The procurement documents are available for unrestricted and full direct access, free of charge, at https://defra-family.force.com/s/Welcome Any questions, requests to participate, or tender submissions must be submitted electronically via this portal. ** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-0521fc
- FTS 043272-2025